6. Assembly Procedures (Full Step-by-Step)

Explains safe, systematic assembly following manufacturer guidance. Covers preparation, base construction, vertical assembly, installation of platforms and guardrails, stabilisers, and final safety checks.

Assembly must always follow manufacturer guidelines. The following is a generalised safe system of work.

6.1 Preparation

​

  1. Clear and cordon off the work area

  2. Gather components in a systematic layout

  3. Inspect all equipment

  4. Assign roles — minimum two workers

 

6.2 Building the Base

 

  1. Arrange castor wheels and lock them

  2. Insert base frames into castors

  3. Attach horizontal braces to square structure

  4. Install low-level platform

 

​ 6.3 Building Upward

​

  1. Add the second tier of frames

  2. Attach diagonal braces

  3. Install working platform with trapdoor

  4. Fit guardrails and midrails

  5. Install stabilisers

 

6.4 Final Checks

​

  • Tower is plumb (vertical)

  • All braces installed

  • All locking mechanisms engaged

  • Working platform secure

25635901.jpg

Free phone
Northwest
Southwest
East

Northeast
Midlands
Southeast

0800 86 11 524
01244 631 881
01985 298 996
01284 645 642

01325 643 664
0121 751 8831
0208 058 0950

Phoenix Energis Ltd

22 Rural Enterprise Centre Vincent Carey Road

Hereford

HR2 6FE

info@phoenixenergis.com

Follow us 

  • Linkedin
  • X
  • Instagram
SafeContractor
MCS
OZEV
ConstructionLine
RECC
RECC
Napit
Trustmark

© 2025 by Phoenix Energis Ltd • Company Number 13754088

bottom of page