top of page

4. Pre-Use Planning & Hazard Assessment

Covers site assessment requirements before erection. Addresses ground conditions, environmental factors, overhead hazards, and access control to ensure the work area is safe and suitable.

4.1 Site Assessment

​

Before building a tower, evaluate:

​

Ground Conditions

  • Level

  • Firm

  • Able to support load

 

Environmental Conditions

  • Wind speed

  • Rain/water on surface

  • Poor visibility

 

Overhead Hazards

  • Live electrical lines

  • Pipes or beams

  • Ceiling fans/ventilation systems

 

Access & Traffic Control

  • Pedestrian areas

  • Vehicle routes

  • Doorways opening into the tower

Picture16.jpg
bottom of page