top of page

4. Pre-Use Planning & Hazard Assessment

Covers site assessment requirements before erection. Addresses ground conditions, environmental factors, overhead hazards, and access control to ensure the work area is safe and suitable.

4.1 Site Assessment

​

Before building a tower, evaluate:

​

Ground Conditions

  • Level

  • Firm

  • Able to support load

 

Environmental Conditions

  • Wind speed

  • Rain/water on surface

  • Poor visibility

 

Overhead Hazards

  • Live electrical lines

  • Pipes or beams

  • Ceiling fans/ventilation systems

 

Access & Traffic Control

  • Pedestrian areas

  • Vehicle routes

  • Doorways opening into the tower

Picture16.jpg

Free phone
Northwest
Southwest
East

Northeast
Midlands
Southeast

0800 86 11 524
01244 631 881
01985 298 996
01284 645 642

01325 643 664
0121 751 8831
0208 058 0950

Phoenix Energis Ltd

22 Rural Enterprise Centre Vincent Carey Road

Hereford

HR2 6FE

info@phoenixenergis.com

Follow us 

  • Linkedin
  • X
  • Instagram
SafeContractor
MCS
OZEV
ConstructionLine
RECC
RECC
Napit
Trustmark

© 2025 by Phoenix Energis Ltd • Company Number 13754088

bottom of page